Road reservation
English to French
Tech/Engineering
Construction / Civil Engineering
road project
The Right of Way is the maximum area subject to occupations and land restriction for the Project and varies between 15 to 30 meters width. This RoW is subdivided into 2 smaller corridors A (Road reservation) and B (Construction Width) as follows:
Proposed translations
(French)
3 +1 | Occupation de voirie | Samuel Clarisse |
Proposed translations
+1
2 hrs
Selected
Occupation de voirie
4 KudoZ points awarded for this answer.